Project Overview:

The purpose of this project is to improve quality and safety for both pedestrians and drivers for years to come. We will be updating the existing roadway, pedestrian and utility infrastructure. The more notable changes we will be making with this project include:

• New 5-lane concrete roadway section to replace the existing roadway, which has reached the end of its useful lifespan and is becoming maintenance intensive
• Downsizing the existing grass and paved medians to help create additional boulevard space for sidewalks and trees
• Upsized storm sewer drainage system to help handle flooding concerns along the corridor
• Water main improvements
• Replacing or rehabilitating the sanitary sewer pipe to extend its usable lifespan

Segment 1 - 32nd Street South to 22nd Street South

Segment 1 of the 32nd Avenue South Improvement project reconstructed 32nd Avenue S between 32nd Street S and 22nd Street S. The reconstruction of segment 1 began in April 2023 and was completed in September 2023.

Segment 2 - 22nd Street South to 15th Street South

Segment 2 of the 32nd Avenue South Improvement project will reconstruct 32nd Avenue S from 22nd Street S to 15th Street S. Construction on Segment 2 is slated to begin in 2024.

Segment 3 - 15th Street South to the Red River

Segment 3 of the 32nd Avenue South Improvement project will reconstruct 32nd Avenue S from 15th Street S to the Red River. Construction on Segment 3 is slated to begin in 2026.