The Texas Department of Transportation is proposing improvements to the interchange at I-2 at I-69C in Hidalgo County, Texas. The proposed project limits on I-2 are from 2nd Street in McAllen to FM 2557 (Stewart Rd) in San Juan and on I-69C from Nolana Loop to I-2 in Pharr.
The proposed project will:
Project will be completed through a Design Build Contract to be executed in 2019. The proposed project would require additional right of way (ROW). Additional studies will determine other potential impacts.
Read More: https://www.txdot.gov/inside-txdot/projects/studies/pharr/i2-and-i69c-interchange.html
Copyright © Classen Graphics Infrastructure Development, LLC.
Solutions for 3D Visualization, Design, Planning & Marketing. NAICS Code: 541430, 541922