I-20 Interchange Carolina Crossroads Phase 2

Category:
Interchanges
State:
District:
No items found.

CAROLINA CROSSROADS:
I-20/26/126 CORRIDOR IMPROVEMENT PROJECT

Phase 2 - Broad River Road at I-20 Interchange

The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing improvements to the interstate corridor of I-20/26/126, including the system interchanges at I-20/I-26 and I-26/I-126 in Lexington and Richland Counties. These improvements are proposed to increase mobility and enhance traffic operations by reducing existing traffic congestion within the I-20/26/126 corridor, while accommodating future traffic needs. The corridor's approximately 14 miles of mainline interstate include I-26 from Exit 101 - Broad River Road (US 176) to east of the Saluda River, I-20 from the west of the Saluda River to west of the Broad River, and I-126 from I-26 to east of the interchange with Colonial Life Boulevard. The project website is at www.SCDOTcarolinacrossroads.com.

In general, Phase 2 consists of reconstruction of the Broad River Road at I-20 interchange and a portion of the I-20 widening east of the I-20/I-26 interchange.

Read More:

https://www.scdot.org/business/carolina-crossroads-phase2.aspx

https://www.walshgroup.com/news/2021/archerwesternandunitedinfrastructuregroupbeginconstructiononcarolinacrossroads.html

Project Views

No items found.

Discover more from this Photographer